|
Product Detail :
|
A.E work Between Spur KM 24.10 to spur KM 24.45 of EAB, Between Spur KM 24.45 to spur KM 24.78 of EAB, Between Spur KM 25.25 to spur KM 25.57 of EAB, Between Spur KM 25.57 to spur KM 26.00 of EAB, Between Spur KM 26.40 to KM 26.88 of EAB. Scope of work includes providing and laying of three Row Porcupine screen with Dampener @ 18m c/c from U/S shank of spur km 24.10 to D/S shank of spur km 24.45 in length of 338m, restoration of porcupine screen with Dampener @ 18m c/c from U/S shank of spur km 24.45 to D/S shank of spur km 24.78 in a length of 270m, restoration of porcupine screen with Dampener @ 18m c/c from U/S shank of spur km 25.25 to D/S shank of spur km 25.57 of EAB in a length of 285m, restoration of porcupine screen with Dampener in a length of 396m @ 18m c/c from U/S shank of spur km 25.57 to D/S shank of spur km 26.00 of EAB, restoration of porcupine screen with Dampener in a length of 396m @ 18m c/c from U/S shank of spur km 26.40 to D/S shank of spur km 26.88 of EAB. Construction of R.C.C M 20 with nominal mix (11.53) porcupine unit of six legs (3.00x0.10x0.10) m with 4 members 8 mm dia. Steel with 6 mm dia. Stirups @ 0.15 mtr C/C, Supplying filling and packing jhawa bush, wood, kans grass or local wood brush in bundles of 600 mm dia. Tied with coir string, Supplying 10 SWG. G.I. Wire for tagging the porcupine sets.
|
| Tender Detail : |
A.E work Between Spur KM 24.10 to spur KM 24.45 of EAB, Between Spur KM 24.45 to spur KM 24.78 of EAB, Between Spur KM 25.25 to spur KM 25.57 of EAB, Between Spur KM 25.57 to spur KM 26.00 of EAB, Between Spur KM 26.40 to KM 26.88 of EAB. Scope of work includes providing and laying of three Row Porcupine screen with Dampener @ 18m c/c from U/S shank of spur km 24.10 to D/S shank of spur km 24.45 in length of 338m, restoration of porcupine screen with Dampener @ 18m c/c from U/S shank of spur km 24.45 to D/S shank of spur km 24.78 in a length of 270m, restoration of porcupine screen with Dampener @ 18m c/c from U/S shank of spur km 25.25 to D/S shank of spur km 25.57 of EAB in a length of 285m, restoration of porcupine screen with Dampener in a length of 396m @ 18m c/c from U/S shank of spur km 25.57 to D/S shank of spur km 26.00 of EAB, restoration of porcupine screen with Dampener in a length of 396m @ 18m c/c from U/S shank of spur km 26.40 to D/S shank of spur km 26.88 of EAB. |