|
Product Detail :
|
A.E work for Activation of central channel after 300m D/S of Kosi barrage upto 4.40 km for smooth flow of river in central region in a width of 30.00 m and also reduce afflux in u/s of Kosi Barrage with suitable bell mouth and having slope 21 with suitable gradient. Earth Work by mechanical means with help of excavator, tipper & spreader in canal or flood embankment or dhar all types of work like filling & making of canal banks or embankment of earth free from logs roots or any other gradient, desilting of canal bed and dhar in proper profile with dressing & finishing including new constructions repair or restoration in ordinary soil including cutting loading carriage from pit to banks or embankment unloading spreading, clod breaking and laying in layers properly with lead of 1000 meter load will be considered as track path i.e half of distance travelled in one cycle i.e half of haulage path from pit to bank or embankment. Pit will be more than 500 meter and with all lifts all complete job as per specifications and direction of E/I. Lead Beyond 1.00 km but upto 1.5 km. Earth Work by mechanical means
|
| Tender Detail : |
A.E work for Activation of central channel after 300m D/S of Kosi barrage upto 4.40 km for smooth flow of river in central region in a width of 30.00 m and also reduce afflux in u/s of Kosi Barrage with suitable bell mouth and having slope 2:1 with suitable gradient. Earth Work by mechanical means with help of excavator, tipper & spreader in canal or flood embankment or dhar all types of work like filling & making of canal banks or embankment of earth free from logs roots or any other gradient, desilting of canal bed and dhar in proper profile with dressing & finishing including new constructions repair or restoration in ordinary soil including cutting loading carriage from pit to banks or embankment unloading spreading, clod breaking and laying in layers properly with lead of 1000 meter load will be considered as track path i.e half of distance travelled in one cycle i.e half of haulage path from pit to bank or embankment. Pit will be more than 500 meter and with all lifts all complete job as per specifications and direction of E/I. Lead: Beyond 1.00 km but upto 1.5 km. |