Product Detail :
|
RFP for Consultancy Services as Authority’s Engineer for Supervision of i) Construction of 2-lane Ukhrul bypass starting at km 537.850 of NH- 202 & joining at km 8.840 of NH-102A (Ukhrul – Toloi – Tadubi Road) and continuing upto km 9.840 of NH-102A (Package-1, Length-6.571 km) in the State of Manipur on EPC mode. ii) Widening/Improvement to 2-lane with earthen shoulder of Finch Corner to Ukhrul section from existing km 34+650 to km 50+520 (Design Chainage km 30+970 to km 45+600) of NH-202 in the State of Manipur on EPC mode. (Package-3, Length-14.63 km). iii) Strengthening of Ukhrul to Choithar section of NH-202 from existing km 50+520 to km 59+230 (Design Chainage km 45+600 to km 54+212) in the State of Manipur on EPC mode. (Package-4, Length-8.612 km).
|